Part of the MLM Group

32 Fortescue Avenue

Fluid were appointed by Simon Conder Associates as structural engineers to add a two storey extension to 32 Fortescue Avenue.

  • Project Cost £1 million
  • Architect Simon Conder Associates
  • Images Arta Garanca / Fluid Structures

The existing building comprised ground, first and second floors. The new extension added a third and fourth floor.

The existing building was some 10 metres tall and the new works added a 6 metre two-storey extension, thus increasing the height by approximately 60 percent. This is a significant extension as apart from the extra dead load the new extension attracts very significant additional wind forces to act on the building. In addition to the two-storey extension, the scheme also features a CLT lift shaft, fitted by a specialist contractor.